Hayfield NE 
Hayfield W 
Pasture field 
Backyard 
Driveway to the house 
Front landscaping 
Starting landscaping 
Walkway done 
No Weeds! 
Garden started 
Garden 75 x 75 
Built brooder – no chicks yet 
Aisha at 4 months 
Matai at 8 months 
Six 5ft pine trees planted near our road 
Tom built enclosure for our sailboat and tractor 
John Deere tractor 
Kitchen faucet and lights 
Bathroom toilet, sink and faucet 
Carpet in three bedrooms 
Final grade done 
Black countertops installed 
Water softener in 
Cabinet hardware in kitchen and baths 
Tub nearly in 
Heat pump installed 
Electrical box started 
Up close color of floor 
Laminate covered in great room 
Laminate is down 
Temporary steps built 
Water pressure tank in 
Cabinets are in 
Well drilled 
Cabinets delivered 
Floors are ready for finishing 
Bathroom vinyl done 
Water still in the basement 
Drying the basement 
A lot of trim! 
Doors delivered 
Closet doors 
Walls painted blue 
Permanent electric 
We have a garage door 
Garage door opener 
Ceiling has been stamped 
Sewer Alien? 
Looking east at four septic lines 
Four very long trenches 
Trenches heading from side yard to back yard 
First trench from tank 
Septic tank installed 
Heat pump structure progress 
Septic system area cleared 
Electrical trench with cables 
Drywall up throughout the house 
Permanent powerline trench 
Drywall has been delivered 
Powerline trench out to pole 
Gutters are on 
Siding is on 
Insulation is in the exterior walls 
Wires and cables in the guest room wall 
Wires and cables running overhead in the great room 
Back 8 acres still to go 
7 acres of weeds mowed down 
Giant ragweed invasion 
Volunteer corn invasion 
Weeds 8 ft high 
New concrete garage floor 
Basement has a concrete floor! 
Front shingles going on 
Back shingles are up next 
All shingles are on 
PVC vent pipes through the roof 
PVC sewage pipes 
Plumbing roughing in 
Roofing materials delivered 
We have 3 windows and 2 sliding glass doors! 
We have front windows and a door! 
Our living room 
Front of house in PM 
Front of house in AM 
Walls are going up 
The floor is started. 
The load of framing materials arrived 
Basement walls done 
Basement walls 
Basement walls poured 
Waterproofing on the exterior 
We now have basement walls 
Footers are being set up. 
Yellow weeds? Great. 
Pretty though 

700 feet of driveway looking towards the home site from the road. 
Bulldozing out the driveway and pouring gravel. 
Using an excavator to dig out the foundation and basement. 
Building has begun in early May 2018. 
Last day with no construction 
Winter before building.