Framing Has Started

The framing material was delivered yesterday. Several pallets of various sizes, 2×10, 2×8, 2×6, plywood and several metal support poles.  You can see almost all of that in this first picture.  There was one roll of insulation. I was curious why that was delivered.  It seems unneeded at this time.

In this next picture, the support poles are in place and standing on the circular concrete pads. There are 6 poles in place running from the middle of the short side all the way to the other end of the house. There are now beams stretching from the wall crossing to all the poles. At the east end of the house, a separate beam stretches across from wall to wall. There are quite a few 2x10s lying loosely on the future floor.  I am assuming the 2x10s will be floor joists and the plywood will make the subfloor. Hopefully, there will be a floor done very shortly.