We have finally made some progress with the roof. In the picture below we finally see the start of shingles going on the front side of the house. Those bags of shingles were up on the roof for nearly a week before work was resumed. At the time this picture was taken last week, only the front was started.
There has been a great deal of rain this past week so we had more delay. Now a week later the shingles are all on as you can see below. Fortunately, enough of the roof was on that no more water has flooded the basement.