We are moving right along. You can see basement walls have been added to the foundation. It is much easier to see the shape of the house. There is not concrete on the floor as yet. Tom and I have been a little concerned over the last few days because it has been raining quite a bit. We wondered how much concrete work could be done with that much rain. Apparently, the answer is a lot! These poured walls have the appearance of brick. You can see on the left side of the picture there are walls around the garage area too. I wasn’t expecting that. They have added the two basement windows on the far side of the house, although at this point they have installed the wrong kind. We will need to get that fixed. Progress!